I have defined a new section in the section archive, when saving the programme gives me an assignment error.
Check the name of the section, by default the programme assigns ‘-’, hyphens should be replaced with a name to be given to the section
Check the name of the section, by default the programme assigns ‘-’, hyphens should be replaced with a name to be given to the section
Those shown on the structural results window refer to the individual pole, the stresses depicted on the diagrams refer to linear metres of work
Yes, the concrete liner is taken into account in the calculation
Yes, the programme calculates the limit load, you must tick the option in the general data and indicate the reductive coefficient for the verticals under investigation.
It is possible to carry out this type of verification using the LEM method. It makes sense to consider this type of verification in the case of a free bulkhead or one constrained by a tie-rod order. Depending on the type of structure, tensioned or free, the programme chooses the point at which to refer…
If the kerb is sufficiently rigid, it serves to ensure that the piles function as a single block, and as such, since the piles behave in the same way, assuming flat deformations, there are no stresses on the kerb itself (it is permissible to consider the kerb out of the calculation and assign, as the…
For this type of work, the programme performs the geotechnical verifications, provides the stresses but does not perform the structural verifications. The section must be defined with the type Input A,E,I from ARCHIVES/SECTION ARCHIVES.
A possible dimensioning moment can be the product of the maximum reaction of the point/tirant by the half-distance in the horizontal plane of two consecutive points/tirants (possibly amplified with a coeff. of e.g. 1.5).A possible dimensioning cutoff for each of the two calculation directions can be given by the maximum reaction of the possibly amplified…
Yes, the free length contributes to characterising the stiffness of the tie rod.
The default combinations are the minimum static combinations required by the standard, the seismic combination must be added: go to the calculation window, right-click on the construction phase and choose ‘New Seismic’, assign the seismic coefficients to this combination only.The combinations, the two default ones and the seismic combination, are the minimum ones required by…