Why does SPW change the length of the bulkhead? I would need to check a known penetration depth
It is possible to perform a verification calculation on a known penetration depth.For this purpose, the FEM analysis method must be selected and the general FEM data set as specified below:Automatic calculation of the penetration depth: No;Initial penetration depth: coincides with the penetration depth to be verified;Increase of the penetration depth: zero. Select the Apply…



